References

delatnost

our portfolio

List of references – execution of works

year

Investor

works description

position

2019

PUC „BVK“ Beograd

Reconstruction of water supply network in Kraljice Natalije Street from Zeleni venac to Balkanska Street

Length: 480 m

Contractor

2019

„KOTO“ d.o.o. Beograd

Execution of hydro-technical works on external installations of water supply and sewerage facilities in Belgrade, 6-8 Vojvode Bojovica Boulevard

Property area: 17.500 m2

Contractor

2019

„IPM“ d.o.o. Beograd

Execution of works on water supply and sewerage installations within the project of construction of the Lindstrom hall in Šimanovci

Building area: 2.000 m2

Contractor

2019

JKP „Parking servis“ Smederevo

Construction works for a two-level vehicle parking structure in Smederevo

Object area: 1.325 m2

Contractor

2018

2019

„BPR Company“ d.o.o. Beograd

Construction works for water supply and sewerage for residential and commercial building in Marija Bursać Street, Zemun

Object area: 6.000 m2

Contractor

2018

City of Čačak

Execution of works for atmospheric sewer connections through cadastral parcels 2127 K.O. Preljina, Čačak

Length: 300 m

Diameter:Ø800-1000 mm (AB)

Contractor

2018

PUC „Parking servis“ Niš

Execution of works on dismantling the FAST PARK structure at the site of the „Usce 2“ special parking lot in Belgrade

Object area: 1.325 m2

Contractor

2018

JKP „Parking servis“ Niš

Execution of works on dismantling the FAST PARK structure at the site of the „Usce 2“ special parking lot in Belgrade

Object area: 1.325 m2

Contractor

2018

Direkcija za građ. zemlj. i izgradnju Beograd

Construction works for the water supply network in Mladih gorana Street in Batajnica Length: 625 m

Diameter: Ø110 mm (PEHD)

Contractor

2018

„Delta agrar“ d.o.o. Beograd

Execution of works for the pipeline "Zone East" - continuation of the section to the future reservoir "Jasenovac" in Zajecar

Length: 1.800 m

Diameter: Ø200 mm (PEHD)

Contractor

2017

2018

„Zop inženjering“ d.o.o.

Execution of works on plumbing and sewege instalation for object within the Termal power plant Kostolac-Drmno, Kostolac

Object size: 4,000 m2

Constructor

2017

PUC „Parking servis“ Belgrade

Execution of works on dismantling the parking lot construction - type „FAST PARK“ on the location „Viška“ in Belgrade

Object size: 1,000 m2

Constructor

2017

PUC „Parking servis“ Belgrade

Execution of works on dismantling the parking lot construction - type „FAST PARK“ on the location „Simpo“ in Belgrade

Object size: 1,450 m2

Constructor

2017

„Delta agrar“ d.o.o. Belgrade

Execution of works on the pump station "Jame" in Zajecar, Vražogrnac

Constructor

2016

2017

„Lidl Srbija“ KD Belgrade

Execution of works on plumbing and sewege instalation for the retail center Lidl - Branch Office F0121 in Subotica

Constructor

2016

2017

„Termoinženjering“ d.o.o. Belgrade

Execution of works on plumbing and sewege instalation for rehabilitation and sanation of the object The Museum of modern arts in Belgrade

Constructor

2016

PUC „Parking servis“ Belgrade

Execution of works on the interior of the business premises of the Client on the location in Takovska Street no. 31 in Belgrade

Object area: 350 m2

Constructor

2016 „Entervox“

Execution of works on water supply and sewage system on the 3rd floor of department stores Belgrade ("Beograđanka") in Belgrade

Contractor

2016

2017

PUC „Vodovod“ Vranje

Execution of works for rehabilitation and extention of water supply network in Vranje
Length: 3,000 m

Diameter: Ø110-225 mm (PEHD)

Contractor

2016 „Brend-mark info“

Execution of works on internal water supply and sewage systems in the building in Vlajkoviceva Street. 6a, 8 and 8/1 in Belgrade
Total area: 6,000 m2

Contractor

2015 Municipality of Varvarin

Execution of works on the water supply system  of settlement Varvarin
Length: 2,200 m

Diameter: Ø110mm (PEHD)

Contractor

2015 „A&P“

Execution of works on connecting water wells within the factory "Pepsi" in Dobanovci

Contractor

2014
2015
Paper factory in Belgrade

Construction of  hydrant waterworks within  Paper factory in Belgrade
Length: 350 m
Diameter: Ø110mm (PEHD),  Ø65 mm (galvanized steeel pipes)

Contractor

2014
2015
PUC " Waterworks and sewerage water" Aleksinac

Reconstruction  of waterworks in Aleksinac
Length:  1.600 m
Diameter:  Ø110-225 mm (PEHD)

Contractor

2014 PUC „Belgrade Power Plant“

Construction of main heating pipelines in the  streets of M. Kovačevića, Bulevar Despota Stefana-access, Višnjička and  Vojvode Micka
Length:   1.100 m
Diameter: Ø500 (355) mm (pre insulated  steel pipes)

Contractor

2013 Clinical Center of Serbia

Construction of water supply network for the boiler house within Clinical Center of Serbia
Length: 550 m
Diameter: Ø110 mm (PEHD), Ø100 mm (galvanized steeel pipes), Ø108 mm (steel)

Contractor

2013 City of Belgrade – Agency for Investment and Housing

Construction of  waste water sewerage for Health center in Surčin
Lenght: 200 m

Diameter: Ø315 mm (PVC)

Contractor

2012

Belgrade Land Development Public Agency

Construction of storm water sewerage system in New  Belgrade with New Belgrade separator
Length: 250 m
Diameter: Ø500-800 mm (PP)

Contractor

2012

PE Roads of Serbia Belgrade

Execution of works on concrete curbs on highway M-5, section Straža - Boljevac
Lenght: 4.000 m

Contractor

2012

PC for development of mountain tourism „Stara planina“ Knjaževac

Execution of works on interlocking concrete pavers on the part of the access road - Roads C2 and C3 (the first stage) "Jabučko ravnište" Knjaževac
Area: 3,300 m2

Contractor

2012

„Mercator-S“ d.o.o.
Novi Sad

Construction of sewerage within  the reconstruction of Mercator shopping center Belgrade

Lenght: 400 m
Diameter: Ø160 mm (PVC)

Contractor

2011
2012

Agency for construction of Serbia, Belgrade

Construction of the external water supply and sewerage systems on  GP4 in the complex "Stepa Stepanović" in Voždovac, Belgrade
Length: 2,000 m
Diameter: Ø250-500 mm (PVC)-sewage,
Ø180 mm (PE)-water

Contractor

2011

Belgrade Land Development Public Agency

Execution of works -assembling of the main pressure pipeline 2xØ600 mm from pump station  "Krnjača 1" until the outlet into the Danube

Length: 2.000 m
Diameter: Ø600 mm (ductile)

Contractor

2011

“MBG”
Belgrade

Reconstruction of gas station on  road to Pančevo

Contractor

2011

Private Investor

Drainage and paving the plateau behind a department store in Zemun for the construction of parking
Area: 400 m2

Contractor

2010
2011

JKP “BVK”
Belgrade

Construction of sewerage system in the village Pinosava, party number XIII
Length: 1,500 m
Diameter: Ø250 mm (PP)

Contractor

2010

The Ministry of Economy and Regional Development, Belgrade

Construction of the sewerage system from the R-109 til IT Park L = 2500 m, Community of Indjija
Length: 2,800 m
Diameter: Ø400 mm (PVC)

Contractor

2011

Maritime Safety Department of Montenegro

Deepening and cleaning the Virpazar canal to the projected elevation and dimensions of the waterway to the confluence in  Lake Skadar
Length: 2,500 m

Chief Contractor

2010

EP Montenegro

Rehabilitation of  tunnel of  hydropower plant
"Piva" in Mratinje

Chief Contractor

2010

TEKO
Kostolac

Cleaning of  cooling water canal TEKO-B

Chief Contractor

List of references – designing:

year

Investor

works description

position

2019 „Lukoil Srbija“ a.d. Beograd

Design for the Ostružnica Oil Refinery Complex in Ostružnica

Designer
2019 JKP „Komunalac“ Vrbas

Study of pipelines and facilities in the water supply and sewerage system of the Municipality of Vrbas

Designer
2018 Direkcija za građ. zemlj. i izgradnju Beograd

Designing of secondary water supply network in the Mladih gorana Street in Batajnica

Designer
2018 „Stublina“ d.o.o. Aranđelovac

Hydrological study of the stream in the zone of the new commercial building of the company "Stublina" d.o.o.

Designer
2017 „Šumadija granit“ Aranđelovac

Hydrological study and hydraulic calculation of the river Kubrsnica in the area of the company "Sumadija granit" in Arandjelovac

Designer

2016

2018

„Lukoil Srbija“ a.d. Beograd

As Built Designs for hydrotechnical and mechanical installations at gas stations for obtaining Water permits

Designer

2016

„Luka Beograd“ a.d. Beograd

Topographic and bathymetric survey of the Danube River on the outside of the Port of Belgrade from km 1167 + 700 to km 1167 + 900

Designer
2015 PUC „Vodovod“ Mionica

The external design of the fortress Golubac complex:

Amendment to the main design for water supply and sewerage
Design Engineer
2013 „ARRIVA LUV“ Beograd Technical solution of drainage plateau for bus parking in Krnjača Design Engineer
2013 PUC „Vodovod“ Mionica General design of water supply in the municipality of Mionica Design Engineer
2013 PUC „Vodovod“ Mionica General design of the collection, disposal and treatment of waste water in the municipality of Mionica Design Engineer

2012

Community of Majdanpek

Modification of the Main design for port in location of archaeological site "Lepenski Vir"

Design Engineer

2011

Community of Majdanpek

The Main design of the typical pontoon for mooring vessel  in the harbor Donji Milanovac

Design Engineer

2010
2019

Private Investors

The main projects of exploitation of sand and gravel (several Investors)

Design Engineer

2010

“MPC”
Beograd

The main designof water supply and sanitation in residential building Kalemegdan Park in Belgrade
Floor space: 12,000 m2

Design Engineer

Licences:

  • Licence for the chartered designer of hydraulic structures, water supply and sanitation, no. No licence. 314 6033 03 
  • Licence for chartered contractor of hydraulic structures and water supply and sanitation, no. No licence. 414 3706 03 
  • Licence to chartered contractors for roads, no. No licence. 415 B689 07
  • Licence for the chartered contractor  for building construction and construction work in buildings, civil engineering and hydraulic engineering, no. No licence. 410 10 E698